One of the most common questions about rewiring. Here is a realistic guide to timescales by property size, and what affects how long the job takes.
A full house rewire is one of the most significant electrical projects you can undertake. One of the most common questions we are asked is: how long will it take? The honest answer is that it depends — but here is a realistic guide.
As a general guide:
These are working days for the electrical work itself. The overall project timeline will be longer if plastering and redecoration are required after the first fix.
Several factors can extend or shorten the time required:
A rewire is carried out in two stages. The first fix involves running all the new cables through the structure before plastering — this is the most disruptive stage. The second fix, which takes place after plastering is complete, involves fitting sockets, switches, light fittings and the new consumer unit. The second fix is much quicker and less disruptive than the first fix.
For a full rewire, it is usually more practical to vacate during the first fix stage, particularly in smaller properties. In larger properties it is sometimes possible to work room by room, but this extends the overall timescale. We will discuss the best approach during the initial survey.
The first fix will require chasing channels in walls and lifting floorboards. Once the cables are in place and the channels are made good, a plasterer will need to skim the walls before the second fix can begin. The overall project — from first fix to final redecoration — typically takes 2–4 weeks depending on the size of the property and the availability of trades.
Brad Neil Electrical carries out full and partial rewires across Surrey. Call 07415 834215 to arrange a free survey and detailed quote.
Brad Neil
NICEIC Registered Domestic Installer · Brad Neil Electrical · Surrey
NICEIC registered Domestic Installer covering Woking, Kingston, Walton, Esher, Cobham, Surbiton and across Surrey. Call 07415 834215 for a free, no-obligation quote.